Energy-saving measures

Does your company invest in a rational energy consumption or green energy? Then you can, besides the Flemish support measures (energy advice through the SME portfolio; ecology premium, green energy certificates) also receive a couple of premiums and interventions via the network operators.

Energy-saving measures

THE FLUVIUS PREMIUMS FOR BUILDINGS WITHOUT A RESIDENTIAL FUNCTION

  1. Premiums for buildings that were connected to the electricity network before 1-1-2006
  • for roof insulation, attic floors, walls (on the outside and cavities), floors, basements (premium/m2)
  • for high-efficiency glazing (premium/m2)
  • for solar boilers, heat pumps and heat pump boilers (max 10K)
  • for relighting
    • the complete removal of the existing lighting (light fittings and lamps)
    • the execution of a lighting study and the installation of a completely new lighting system
    • premium can only be granted once per interior space
    • works carried out by a contractor
    • max 15K without and 20K with daylight control
  1. Premiums for buildings that were connected to the electricity network before 1-1-2014
  • for solar boilers, heat pumps and heat pump boilers
  1. Investment premium after energy study:
  • the building is at least 5 years old on the date of the premium application
  • an energy study or audit that has been carried out must demonstrate that the investment(s) in the building yields significant energy savings compared to the current situation
  • investment for 'state of the art' or the best available techniques
  • the investment has a payback period (PBP) > 2 years
  • the investment was actually carried out • a maximum of 25K euros per project and per year
Energy-saving measures

THE ELIA PREMIUMS FOR BUILDINGS WITHOUT A RESIDENTIAL FUNCTION

  1. Investment premium after energy study:
  • an energy study or audit that has been carried out must demonstrate that the investment(s) in the building yields significant energy savings
  • the investment has a payback period (PBP) > 2 years
  • Before the investment can be carried out, the energy audit must be submitted to Elia for approval
  • Only after approval the client can place an order.
  • Max 200K per client per site

Contact

Do you want more information on these support measures?